Construction Order
01_Preparations
After polishing the installation surface,
measure the dimensions of the part to be
installed.
02_Cutting A
Since the ceiling material is composed of three parts, place the central part to the center and cut it
out.
02_Cutting B
Since the ceiling material is composed of three parts, place the central part to the center and cut it
out.
03_Installation
At first, place the central part on the right
position and place the left and right parts to
be ready to be installed.
04_Assembly
After adjusting the RIB of the central, left,
and right parts with VIS, fix the assembled
on the finish line of the tiles.
05_Finish
After wiping the surface clean, fill up the gap
between the tiles and the ceiling with silicon
and check products for defects.
DAEJOO
CS CENTER
+82-2-523-0088
Company
CEO's Message
VIsion
History
Organization
Factory & Facility
Location
 
Product
Bathceil & Bath
Tile
SMC Water Tank
SMC Sheet
 
Photo
SMC Bathceil
ABS Bathceil
SMC Tile
AL Tile
SMC Bath
SMC Water Tank
 
Library
Catalogue Downlod
Certification
SMC Exterior light work
Drawing
Construction Order
Floor Plan
 
Board
News
Quotation Inquiry
Copyright © by DaejooCS Co., Ltd. All right reserved.